Produtos similares
Quem usa esse software?
General and Subcontractors as well as Owners and all members of the financial team needed for very large projects.
Avaliações médias
72 avaliações- Geral 4.1/5
- Praticidade 3.9/5
- Atendimento ao cliente 4.5/5
- Recursos 4/5
- Relação qualidade/preço 3.9/5
Detalhes do produto
- Versão gratuita Não
- Teste Grátis Não
-
Implantação
Nuvem, SaaS, web
Celular - iOS nativo
Celular - Android nativo
-
Formação
Ao vivo online
Webinars
Documentos
-
Assistência
24 horas por dia (representante ao vivo)
Horário comercial
Online
Dados sobre o fornecedor
- PASKR
- http://www.paskr.com
- Fundada em 2004
Sobre o PASKR
PASKR is a cloud based construction management solution built for every member of your construction team to bid, build, and track great projects. PASKR brings efficiency, visibility, and accountability by streamlining back office and field operations. Users are able to access all project related information through any web connected mobile device, tablet, laptop, or desktop.
Recursos do PASKR
- Controle de horas e despesas
- Controle de marcos
- Ferramentas de colaboração
- Gestão de carteira
- Gestão de ideias
- Gestão de orçamento
- Gestão de recursos
- Gráficos de Gantt
- Metodologias ágeis (Agile)
- Modelos personalizáveis
- Métodos tradicionais
- Portal do cliente
- Quadro kanban
- Seguimento do custo até a conclusão
- Análise hipotética
- Banco de dados de historial
- Estimativa de climatização
- Estimativa de materiais
- Estimativa elétrica
- Gestão de projetos
- Gestão de terceirização
- Integração da contabilidade
- Modelos personalizáveis
- Orçamento de serviços de encanamento
- Registro de auditoria
- Relatórios e análise de dados
- Acesso offline
- Acesso para Celular
- CRM
- Comercial
- Edifícios residenciais
- Empreiteiras
- Estimativas
- Geração de relatórios de incidentes
- Gestão de contratos
- Gestão de terceirização
- Integração da contabilidade
- Pedidos de mudanças
- RFI e envios
- Rastreamento de equipamentos
- Rastreamento de orçamentos/Custos do trabalho
- Banco de dados de custos
- Banco de dados de materiais de construção
- Compartilhamento de arquivos
- Controle de versões
- Estimativa de materiais
- Gestão de RFP
- Gestão de licitantes
- Gestão de propostas
- Gestão de terceirização
- Orçamentos e estimativas
Produtos populares
As avaliações mais úteis do PASKR
PASKR review
Avaliado em 19/11/2018
Brett R.
Comentários: We love it. Invoices and time card merge with Quick book, some errors but at least most of the data gets transferred, account just needs to verity all the info is correct instead of entering all of it.
Vantagens:
We have used for almost 3 years. We use the program everyday. Our site supers use it as much as the PMs and accounting.
Pretty easy to learn. When there are issues their IT is on it right away.
We use it primarily for Time cards, estimating and contracts, although there are lots of other features.
Desvantagens: It does not work as well with I Phones as well as android. We have some issues with time cards and daily reports when the supers are on an I phone. Although they are updating all the time, so I hope they find a solution soon
Paksr Project Management
Avaliado em 07/01/2020
Mark T.
Comentários: We have used it for about one year with the firs several months using the program for bid management, we are just now getting into the meat of the application for pay apps, submittal tracking, RFI's, etc. Most of these tasks are straight forward and easy to use.
Vantagens: Very comprehensive application with mobile and desktop (web browser) applications. Cloud based allowing all users to stay up to date with, and share project information. Customer service/training for the most part is excellent.
Desvantagens: In consistent user interfaces between desktop (web browser) and mobile applications. Some modules are a little bit awkward to use. Inability to add contacts and cost codes on the fly.
Resposta dos fornecedores
por PASKR em 09/01/2020
Mark, thank you for taking the time to leave a review on your experience with PASKR. We're glad to hear you found the tasks straight forward and easy to use your first year with us. Over the next 6 months, we are working on being able to add contacts and cost codes available everywhere. We appreciate your suggestions and are glad to provide an easy to use software for you and your company to use!
PASKR project management
Avaliado em 11/10/2016
Ron N.
Comentários: I've been using this management software for most of the last 6 years. Overall it is very helpful and makes me more efficient managing projects. There have been some recent changes that I feel have taken away some valuable functionality, but they have been very willing to listen and explain the reasons for the changes. They are also willing to look at my concerns and consider restoring some of the functionality that was lost.
Vantagens: It makes project management more efficient. I don't have to enter the same information over and over on various documents. It also gives multiple reports to track a project and watch the changes in profitability. It also is easy to prepare bills each month.
Desvantagens: The scheduling module is very difficult to use in my opinion and the connect between scheduling and daily job logs could be better. Having to approve each schedule change individually is very time consuming, especially while the screen refreshes
Resposta dos fornecedores
por Paskr em 20/10/2016
Thank you for your comments. You spoke about some of the features you missed and we listened. We have recently added the functionality to be able to invite the subs by cost code and we will have a customer care representative contact you shortly to show you how to do this. We look forward to many more years of working together.
Your Paskr Team
PASKR
Avaliado em 07/01/2020
John C.
Vantagens: Various project management abilities including monitoring of project purchasing, subcontractor management and billing and employ time management. Excellent customer service and customer service reps who are always available and are quick and knowledgeable on the chat feature when we have a challenge. The Customer Service and Programming teams at PASKR have always been helpful and accommodating to help and improve PASKR.
Desvantagens: No serious dislikes at this time. As stated above the PASKR team is very accommodating.
Resposta dos fornecedores
por PASKR em 09/01/2020
John, we appreciate you taking the time to leave a review on our software! We're so glad to hear your experience with our Client Experience Team has been wonderful. Our top priority is providing a team of knowledgeable and helpful people creating an excellent product and accommodating our wonderful clients with any questions or needs they have. Thank you again for your kind words and for letting us serve you!
Great...10 years ago
Avaliado em 28/11/2016
Andrew M.
Comentários:
I had never heard of Paskr (P for short) until I started at a new company. I use P for Project Management and some estimating/bidding tasks. There are a couple of things that P does well but many things it does bad or isn't user friendly AT ALL. For example:
1. The menus are all slightly different and organized different. In one menu "pay applications" are called " billing". And "meeting minutes" are called "project minutes". Who calls them that?
2. The menus are all very sensitive to rolling your mouse over/down them. I am forced to go very slowly to navigate where I want to.
3. When building an estimate I cannot arbitrarily rename a cost code if the description isn't really accurate. I also cannot use the same cost code multiple times. I might want to do that if I am breaking an estimate down into multiple phases or areas.
4. Estimating is very rigid and not user friendly for reporting how estimates evolve from conceptual through final bidding. When you do create an invited bidders' list it will invite subs for multiple cost codes unless you tell it otherwise...every single time. This is a product of our sub data base being overpopulated with subcontractors performing work associated with multiple cost codes. But, for example, to assign a subcontractor only one division 5 cost code and not all division 5 cost codes I have to remove him from all the other Div 5 codes that I may be using in the estimate.
5. When I right change orders to the subs they are not grouped together but only in sequential order. And if I write an Owner CO with the sub CO's grouped together they show up in different parts of the screen so if I'm looking for a subs' last CO I have to look in two different places
6. Meeting minutes are horrible. You cannot simply create a new/updates status for items that get tracked from meeting to meeting.
7. Generating my Owner billing can be a huge pain because it will not let you bill more than a SOV line item has left in it. What if I needed or was required to bill more in Div 6 and less in Div 12? The only way to do that would be via creating a change order and then billing the added/subtracted amounts under a CO heading.
8. Reporting is a joke. One of the easiest and most often used reports is a "committed cost report". It doesn't exist when you go to the "reports" tab. However, you can print one if you go to the Purchase Order tab and run a report through that module. Stupid.
Now for something good:
1. Reviewing and approving subcontractor billings is easy
2. Paskr will automatically pull in subcontractor billings into my Owner billing which can be handy or a pain in the ass if you want to do something different.
3. RFI's are relatively easy to create, but who can screw that up?
4. Writing subcontracts is pretty effortless. Although, writing a subcontract to a cost code that wasn't in your final estimate can be a pain in the ass to make happen. And you cannot write a subcontract/PO to a vendor who doesn't have that particular cost code associated to him already.
Overall, P is rigid and not user friendly or flexible to how different Project Managers want to set up and run our jobs. I have used Timberline in the past and although Timberline is poor when it comes to customer support I would beg, borrow, or steal to have it over Paskr. I cuss P every single day and I use it for as few things as my company will allow. My number 1 goal for next year is to try and get away from Paskr.
Resposta dos fornecedores
por Krista em 19/12/2016
Andrew,
This is great feedback. Thanks for taking your time to review the software. I think you would make a great addition to our Customer Research Team. This team helps drive our product direction by reviewing our ideas and giving feedback. I will call you to get you involved if you are interested.
I would like to address your concerns as listed:
1. Inconsistent nomenclature – We are in the process of upgrading every module in Paskr to take advantage of new technology. As this upgrade continues you will find fewer of these inconsistencies. You will also find some great new functionality.
2. Over Sensitive Drop Down Menus – Excellent observation, one we have made ourselves. Look for these to disappear as our upgrade continues.
3. Cost Codes
a. Arbitrary renaming of cost codes – Unlike any other Construction Project Management software, Paskr integrates all modules by default. These integrations restrict us from granting your request to be able to arbitrarily assign cost code descriptions on the fly. The benefits of a fully integrated suite are repeatable processes that reduce risk, the ability to truly have paperless processes and the elimination of over 100 menial tasks. That said, you can create your own cost codes and we can show you how to do this.
b. Using a cost code multiple times in a project – Paskr provides several ways to use cost codes multiple times within a project. We will reach out to you to get you up to speed on this.
4. Paskr assigns all available cost codes to a bidder – This is a real time saver and convenience for most of our clients. For a simple example, let’s say you have assigned both Interior Lighting and Exterior Lighting to Joe’s Electrical Company in your contact database. You then create a project with both of those bid items in it and invite Joe to Interior Lighting. Paskr goes ahead and assigns Exterior Lighting to Joe’s bid form also so you don’t have to. In the case that you wish to remove one, it is quite simple to do. I think you are on to something when you said “This is a product of our sub data base being overpopulated with subcontractors performing work associated with multiple cost codes.” We will reach out to you to show you how to quickly remove cost codes from a bid form and more importantly, to get your contact database structured correctly. (So you won’t have to worry about this in the future).
5. Change order sequencing – If a Subcontractor change order is not related to an owner change order they are listed in the order in which they were approved. If they are included in an Owner change order, they are shown nested under the parent Owner change order. There is a subcontractor filter which allows you to quickly see all change orders issued to a selected subcontractor. We will add this to the list of things to show you. Screen appearance is very definitely a preference and everybody has a different one. I look forward to hearing your preferences and incorporating any ideas that will help our client base.
6. ‘Meeting Minutes are horrible’ – We know this module needs to be updated. I look forward to your input as to how to improve this when we upgrade it to the new platform.
7. Owner Billing Rigidity – Paskr’s owner billing follows the standard set forth by AIA. This format is very accommodating for lump sum projects but lacks some flexibility for cost plus projects. This is true also for any owner billing software other than Excel. If a project requires a nontraditional Continuation Sheet, some clients create this with excel and attach it to the cover sheet that Paskr creates.
8. Committed Cost Report – We have a Committed Cost Report on steroids. We call it the Job Status Report because in addition to committed costs, it gives you information that helps you compare your estimate to your buy out and see your forecast as well as any potential Revenue and Expenses in the form of RFPs and Change Orders awaiting approval. This allows us to go a step further than your typical Cost Commitment Report by showing not only Total Uncommitted but also Pending Profit and Forecasted Profit. This has proven to be a great tool for both the Accountant and the Project Manager. If you will open any project In Progress and click the reports tab, under Accounting you will find ‘Job Status Report’. If you find that this report does not meet your needs, we are always happy to create a custom report for you.
9. Writing a subcontract for a cost code not in your budget – You are right about this. Your Accountant would have real heartburn with Paskr if we allowed you to do that. So, we created a super easy way to add a cost code to your project in seconds. This is something I will add to the list of things we need to show you.
Andrew, I have checked our training logs and see that you have not watched any training tutorials or taken advantage of our live webinars. If neither of these appeals to you, we also provide one-on-one training via webcast or onsite if you prefer.
I also encourage you to take advantage of our support team who are some of the best consultants around. I am going to ask our Training Manager to help you understand how to best utilize Paskr for your specific needs.
Thank you again for your feedback and you should be hearing from us soon.
Very Sincerely,
Krista Phillips
Product Manager
Paskr Software